we are self-confident to offer our consumers adaptable and diversified companies. our items are promoting effectively in the American, European, South American and Asian marketplaces. Support & Top quality controlWe provide detailed drawings and supply whenever necessary. A: Merchandise Title: Metal EPT JCEPs–1 quot STUB Stop SCH10S–WP304
one. STUB End
2.Wall Thickness: SCH5S-XXS
three.Dimension Variety:
Welded: one/two quot-48 quot (DN15-DN1200)
Seamless one/2 quot-24 quot(DN15-DN600)
four.StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
AEPTE B16.9, GB/T12459,GB/T13401,SH3408,SH3409,HG/T216345,HG/T21631, MSS SP-43, DIN2605,JIS B2313
five.EPT
Grade: 304/L, 316/L,321/L, 317/L,347/H, 904L,310S, Duplex2205/S31803/F51,
2507/S32750/F53, ASTM A234, WPB/WPC/WP11/WP22
6.End Remedy
EPTTl Ends , Simple Finishes , or as for every EPTTs Requirements
seven.Floor Therapy: Clear Oil
eight.EPTT: EPTen box or as per customers’ requirements
Stainless Steel Materail and Quality | ASTM A403 ASTM A815 A182 WP304/304L,316/316L,2205,2507,F304/304L,316/316L and so on |
EPTT Metal EPT | A105 ASTM A234, ASTM A420, ASTM A860,A350, A234 WPB,A420 WPL3/WPL6, A860 WPHY42-70, A350 EPTT2 etcetc |
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | AEPTE B16.nine,AEPTE B16.eleven and so forth |
Conclude Contaction | BW,SW,Threaded,Groove |
Outside Diameter | 1/2 quot – 24 quot (EPTLS/SEAMLESS) |
26 quot – 100 quot (WELD) | |
Wall Thickness | Butt Welded : SCH10-SCH160, STD, XS, XXS |
Processing technic | BW Type |
EPTLS = Seamless (Dimensions one/2 quot – 24 quot) | |
Welded = Seam Welded with one hundred% X – Ray Test | |
Area | Sand Blast,portray,coating,galvanized and many others |
Deal | EPTen box,Pallet |
Inspection | BV,SGS,INTERTEK |
Certificate | ISO90012000,API |
Day of Delivery | twenty-30days |
Payment | L/C or T/T |
Port of Shipment | ZheJCEP and XiHu (West EPT) Dis.hu (West EPT) Dis.g,EPTT |
B. EPTT Support amp Our Benefits
1.We are a manufactor of Solid Flange. Also, we have numerous qualified cooperated mills to supply JCEPs and EPTs. We also do OEM for korea and europe mills for EPTT time.
2.Our EPT can reach to the needs of AEPTE stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
three.EPTT as our most imfortant stage in our company. And guarantee that all the raw components are a hundred% inspected completely according to our customers’ ask for.
4.we examine chemical composition for each and every great deal of our content , and source the document to issue the three.1 EPTT Certification. If required, we can deliver the three.1 EPTT Certification collectively with the transport paperwork
five.Manufacturing facility direct sales, We offer merchandise in Fastest Delivery time as we can in accordance to the quantity and ask for.
6.EPTT: EPTen Pallet or EPTen box as per customers’ demands.
7.Surface: Black Lacquer or Transparent Oil