Hydraulic China in Diyarbakir Turkey bowex m42 coupling sales Plunger in Niigata Japan flexible gear factory Hydraulic Pump Spare Parts for Ap2d25 with top quality lowest price

Hydraulic  China  in   Diyarbakir Turkey   bowex m42 coupling sales  Plunger  in   Niigata Japan   flexible gear  factory  Hydraulic Pump Spare Parts for Ap2d25 with top quality lowest price

We – EPG Team the greatest couplings and gears factory in China with five distinct branches. For a lot more information: Cellular/whatsapp/telegram/Kakao us at: 0086-13083988828 /

 

This table lists the company’s sale of most of products.
Sequence/Part no. Description
(1)  Rexroth / Uchida Rexroth A2FO/A2FM/A2FE10-250, A2F12-500, A2VK5-55MA, A6V28-250, A7/8V28-five hundred, A8V80-107  
  A6VM/A7VO28-500, Uchida A8VO55-two hundred  
  A4VSO40-500, A4V40-250, A4VG28-250,  A10VSO18-a hundred and forty,  A10VG28-63  
  Uchida AP2D12-38,  A10V/VD/E40-43, Rexroth A11VG50,  A11VO40-260, A20VLO260  
   
(two)  Vickers PVB/MPVB5-one hundred ten, PVQ10-32, MFB5-29,  PVE19-21,  PVH45-141, PVD45, PVM571,
  PVXS130-250
(3)  Eaton 3321,  3932,  4621,  5421,  6423,  7621, 78462  
(4)  Sauer Sundstrand SPV14-18, PV20-27, MPV046, PV90R30-250  
(five)  Caterpillar VRD63, AP12-fourteen, 320C, SPK10/10, SPV10/10  
  E200B new, 12G, 14G, 215, 245, 330B, PSV450, 992/963  
(6)  Liebherr LPVD45 / 64 / 90 / 100 / 125 / 140 / 250 / 260  
(seven)  Linde HPR75/one hundred/a hundred thirty/one hundred sixty, B2PV35-140, BMF50-a hundred and five, BPV35-70, BMV75.27, BPR140/186/260  
(8)  Parker / Volvo F11-005 / 571 / 150 / 250,  F12-060 / 080 / 110  
(9)  Kawasaki / Teijin Main pumps: K3SP36C, K3V63-280, K5V80-two hundred, NV64-270, NX15, NVK45, KVC925-932  
  Swing motors: M2X63-210, M5X130-180, MX150-500  
  Travel motors: MAG150-a hundred and seventy, GM05/06VL, GM05/07VA, GM08-23/30H/35VA/35VL/38VB, DNB08  
(ten)  Komatsu Main pumps: HPV35/fifty five/ninety/ninety five/132/one hundred sixty, PC40-eight, PC60-seven, PC100/two hundred/300/360/400  
  Swing motors: PC45R-8, 60-6/7, KMF40-105, KYB33-87, PC200-6/seven, 300, 400, 650  
  Travel motors: HPV105  
(11)  Hitachi Main pumps: HPV091 / 102 / 116 / 125B / 145  
  Swing motors: EX120-two/5  
  Travel motors: HMGC32 / 35, HMGE36, EX550-three  
(12)  Toshiba Swing motors: SG02 / 571 / 04 / 08 / 12 / 571, PVC90R, PV090  
(thirteen)  Kayaba / Sumitomo MSG-27P/44P, MSF-85, MAG-33VP, JMV-fifty three/34, PSVD2-21E/26E, PSV2-55T, 280  
(14)  Kobelco Travel motors: SK200-one/three/six, SK220-two/3 (MA340), SK320 & SK430  
(15)  Nachi PVD-2B-32L / 34 / 34L / 36L/38/40/forty two, PVK2B-505, YC35-6  
(sixteen)  Kato Travel motors: HD400 / HD450V-2 / HD1571 / HD3000  
(17)  Tokiwa MKV23 / MKV33
(18)  Bobcat 331 & 337
(19)  Hawe V30D95-250, V60N
(20)  Tadano Tadano 100, 150
(21)  Denison PV29-seventy four
(22)  Parker Parker BMHQ30/PV092/140/a hundred and eighty  
Rotary group parts for hudraulic piston pump,meet with special market,
advanced technology,perfect design,top quality    

Our business can provide a huge amount of  piston pump (motor) components, Specific versions are as follows:

 We offer the  hydraulic piston pump (motor) which at present has much more than 1185 types of types and reducer assembly elements kinds has far more than 12367 kinds of (including plunger sliding boots, cylinder, oil distribution plate, swing, variable piston, generate shaft, skeleton oil seal, gear pump, rod, force plate, central shaft, spindle, inclined plate, the ball hinge spring, ball joint, again plate, the thrust plate, friction plate, separator, oil distribution disc plug, bushing spring and other elements).We think there is usually a item that you will want.
 
Merchandise Description:

 

A lot more brand names of pumps elements:

EPT EXCAVATOR Series:
HPV35 (PC60) HPV55 (PC120) HPV90 (PC200-three) HPV90 (PC200-5) PHV95 (PC200-six, PC120-6 in addition to the pump shaft). HPV132 (PC300-7, PC400-6) HPV160 (PC300/400-3/five) HPV135 PC30UU PC40-8 main pump PC50 (PC55/56) PC60-seven primary pump (HPV75) PC160 PC200-two (principal pump) PC200-eight major pump/PC240-8 major pump PC320 PC360-7 principal pump (PC300-seven) PC400-seven main pump PC1250 main pump PC45R-8 rotation PC60-6 rotation PC60-seven rotary PC120-six rotation PC200 – six rotary/LMF45 PC200-seven rotary motor PC450 rotation PC300-six rotation PC200-seven wander PC400-seven stroll HPV220-8 rotation PC650 rotary.

 

CAT Series:
VRD63 (CAT120) double pump SBS80 (CAT312C) main pump E200B (new) double pump AP – 12 double pump AP-fourteen (CAT325C) CAT320C double pump SPK10/ten (E200B) double pump SPV10/ten (MS180) double pump CAT12G CAT14G / sixteen g CAT215 CAT245 Strolling CAT330B motor Walking PSV450 (AP-12) CAT992 CAT330C walk CAT385H.

 

KYB Sequence:
PSVD2-sixteen e (1.6 2 tons of sunvo intelligent) PSVD2-21 c (KYB) PSVD2-21 e (KYB) four t/SVD22 little dig principal pump 27 PSVD2-26 e/e (KYB) KYB – 25 cc (forty five ishikawa island, long yasuda K040 / K045) Ishikawa island 60 PSVL-54 (yasuda KYB prolonged six tons of a hundred and fifty five drivers) PSVK2-twenty five KMF40 KMF40-two KMF90 (KPV90) PC200-one/2/3 (rotary, walking) KMF105 KYB33 KYB36 KYB37 KYB87 KYB90 (MSG – 60 p) MSG – 27 p (KYB)/LSGMF27/ten w MSG-44 p (KYB)/LSGM44/10 w-R21 Mag-vp-480-e-two (4-5.5 tons of little excavators strolling motor) MSF-85 (rather of ZF motor) PSV2 sumitomo one hundred twenty-fifty five t (KYB) Sumitomo 280 rotary V25..

NACHI Series:
PVD-two-b-32 l PVD-2-b-34 stroll PVD-two-b-34 l (small dig primary pump) PVD 38/forty-two-36 b/l PVD-2-b-forty two PVD -two-b-sixty three PVD45 Nachi a hundred thirty PVK-2-b-505 (ZAX55 primary pump) YC35-six yuchai little dig a rotary motor YC35-six yuchai minor dig strolling motor PCLS 18-200-b (yuchai fifty five rotary) The bobcats 331 drivers (rotary) The bobcats 337 strolling (motor).

TOSHIBA Series:
SG02 SG571 (MFB40) SG04 (MFB80) SG08 (MFB160) SG12 SG20 (MFB250) PVB92 (PVC90RC08 / PVC70R) (8.5 tons of drivers Toshiba 8 tons, yuchai) PV090 PV092 (PV080 gm) PSVS – ninety.

JIC Collection:
JMV-forty four/22 JMV-fifty three/34 (6 to eight tons of modest excavator walking motor) JMF-sixty four JMV147/ninety five JMF-151-VBR (22 sm1510117) JMF-155.

LIEBHERR Sequence:
LPVD45 LPVD64 LPVD75 LPVD90 LPVD100 The new LPVD100 (914) LPVD125 The new LPVD125 LPVD140 LPVD250 LPVD260.

KOBELCO/KATO Series:
SK250-8 major pump SK200 – a third going for walks motor SK220-three (MA340 walking motor) SK200-six strolling motor SK200-6 new strolling Going for walks SK320 motor M3V150 (SK220-two) strolling motor Strolling SK430 motor Kato four hundred motorists motor HD450V – two (kato) HD3000 DH55 fifty five motorists rotary motor (daewoo) T3X128 / daewoo three hundred-seven rotary Daewoo stroll 225-seven Daewoo DH370 rotation Modern sixty-seven rotary motor Modern 480 rotary motor.

KAWASAKI Series:
K3SP36C (SDV36) 8 tons medium-sized motorists major pump K3V63DT (K3V63BDT) K3V112DT K3V140DT K3V180DT K3V280 K3VG280 K3VG180 K3VL45 K5V80 K5V140 (doosan 300-7) K5V160 (modern three hundred-six major pump) K5V200 (450/470 in Japan, god steel 470, Keith 480 principal pump) K7V63 NV64 NV84 NV111DT NV137 NV172 NV270 NX15 NVK45 metal drivers (god) KVC925 KVC930 KVC932.

KAWASAKI SWING Collection:
M2X63 M2X96 (EX200-2) M2X120 M2X146 (EX200-5) M2X150/a hundred and seventy (EX400) M2X210 (EX270/280/300) M5X130 (CAT320C) M5X180 (steel 350-8 god) MX150 MX173 MX500 MAG150 MAG170 LZV30 LZV120 LVW060 TM40VD wander Modern three hundred-5.

NABTESCO Travel Collection:
M2X63 M2X96 (EX200-2) M2X120 M2X146 (EX200-5) M2X150/a hundred and seventy (EX400) M2X210 (EX270/280/300) M5X130 (CAT320C) M5X180 (steel 350-8 god) MX150 MX173 MX500 MAG150 MAG170 LZV30 LZV120 LVW060 TM40VD stroll Modern three hundred-five.

REXROTH Sequence:
A4V40 A4V56 A4V71 A4V125 A4V250 A4VFO28 A4VSO40 A4VSO71 A4VSO125 A4VSO180 A4VSO250 A4VSO355 A4VSO500 A4VF500 / A4F500 A4VG28 (A4F571) A4VG40 A4VG45 A4VG50 A4VG56 A4VG71 A4VTG71 A4VG90 (32 A4VT90HW/r) A4VHW90 A4VTG90 fill oil pump (thick) A4VG125 A4VG125 pump A4VG125 pump kind (typical use) A4VG125 pump variety A10VO28 (string) A4VG12 fill oil pump (big) A4VG140 A4VG180 A4VG250 A10SO16/18 A10VSO28 A10VSO45 A10VSO45/52 A10VSO63/52 A10VSO63/fifty three A10VSO71 A10VSO85 A10VSO100 A10VSO140 A10VG18 A10VG28 A10VG45 A10VG63 A10V43 (double pump) A10V63 A10VD40 (double pump) A10VD43 (double pump) A10VE43 A10VEC60 A10VSF28 A11V040 A11VG35 A11VG50 A11VO60 A11VO75 A11VO95 (A11V95) A11V130 A11V145 A11V160 A11V190 (A11VLO190) A11VO200 A11VO250 A11VL0260.

REXROTH BEND AXIS Series:
A2F5A2F12A2F23A2VK282VK28A2F28A2F55A2F80A2F107A2F160A2F200 A2V225A2F250A2V500A2V915A2F355A2F500A2F1000A2FO10A2FO12A2FO16A2FO23A2FO28A2FO32A2FO45A2FO56A2FO63A2FO80A2FO90/A2FE90A2FO107A2FO125(A2FM125)A2FO160A2FO180A2FO200A2FO250A2FO500A6V28A7V55/A8V55A7V58A7V80/A8V80A7V107/A8V107A7V160/A8V160A7V200A7V225A7V250A7V355A7V500A6VM/A7V1000A6VM/A7VO12A7VO28A7VO55A7VO80A7VO107A7VO160A6VM160A6VE160A6VM200A6VM500A7VO172A7VO200A7VO250A7VO355A7VO500.

REXROTH-UCHIDA Collection:
one(REXROTH)A8VO55/A8VO80/A8VO80/six.three/A8VO107(SUMITOMO 280)/A8VO140/A8VO160/A8VO200
two(REXROTH)AP2D12( EPT 331MAIN PUMP)/AP2D16(Scenario 35)/AP2D21/AP2D18(IHISCE 45 Major PUMP)/AP2D25(DH55 Major PUMP)/AP2D36/ZAX70 Principal PUMP

SAUER Series:
PV20PV21(PVD21)PV22PVD22PV23(PVD23)PV24SPV6/119PV25PV26PV112OPV27MF16AMFO35MF500MPVO46/M46MPR63MPV45.

SAUER 90 Collection:
PV90R30PV90R42PV90R55PV90R75PV90R100BRL100PV90R130PV90R180PV90R250SPV14SPV15SPV18MMF571CMPT044M44HRR057.

EATON Series:
3321/3331 (Eaton, 006) Eaton 3322 (EATON3322) 4621/4621-007 5421/5431 (Eaton 23) Keith 1460 (CASE1460) Keith CS05A Eaton 3932-243 Eaton 6423 (Eaton 24-7620-7621) Roller (Eaton, 78462).

EATON-VICKERS Series:
PVE19TA19PVE21PVH45PVH57PVH74PVH81PVH98PVH106(HPN-1398)PVH131PVH141PVB5PVB6PVB10PVB15(PVQ32)PVB20PVB29PVBQA29-SRPVQ40/50PVB110TB35B45.

TOKIWA Series:

MKV23/MKV33

TADANO Collection:

(TADANO)one hundred/150
HAWE Sequence :
V60AV60AV30D95V30Z95V30D140V30D250
LINDE Series: 
HPV55T HPR75 HPR100 HPR105 HPR130 HMR135 HPR160 , a hundred and sixty B2PV35 B2PV50 (BPR50) B2PV75 (BPR75) B2PV105 (BPR105) B2PV140 BPV35 BPV50 BPV70 BPV100 BMV75.27 BPR140 BPR186 BPR260 BMF50 BMF75 BMF105.
PARKER SERIES:
F11-005F11-571F11-571F11-28F11-39F11-58F12-060F12-080/F12-090F12-110-MF-1HF11-150F11-250PVXS130PVXS180PVXS250PVSO250PV180PV250PLV250PVM-018PVM-571BMHQ30/PV180PAVC38PAVC65PAVC1002145/P214523PZ075270/PV270PVP76PV29PV74PV0087P76PVG130 BPSV600PVT38PVT38PVT64PK100PMT14/18P080P2105P2060BZ732-100SH5V/131.
YUKEN Sequence:
A16A22A37A45A56A70A90A145
HARVESTER Collection:
HPVMF23(T23C)HPVMF23.7T28CT30CT37C

All these add-ons are fully interchangeable with authentic, substantial good quality and lower price.

Our Firm Services

one) We can help purchasers design and style distinct products or produce products according to buyers’design

2) We can print symbol in accordance to buyers’ requirement

three)We has exported to several international locations,this sort of as Korea, United states, German, and so forth.

 

Customer Service

one. You could email us by means of the Alibaba messaging system if you have a query

or would like to submit a remark.

2. Usually, e-mail will be responded to within 24 hours apart from on every Sunday

and vacations. We will reply as before long as we back in business office.

two. We will ship you tracking information to the e-mail tackle you have registered with Alibaba.

three. If you do not see what you are seeking for, just deliver us an e-mail with picture/image

and we will be glad to help you.

4. Good feedback is quite critical to us.

 

Packaging & Shipping and delivery
Shipping Particulars

Delivery time depends on the spot and other variables, it may possibly up to seven operate times.

In buy to guarantee you get you order tax free of charge upon import, we will declare it as a “Sample”with a reduce worth.This decrease price does not reflect the complete value you compensated.

Right after we ship the goods, we will email you the transport information, as effectively as monitoring amount.

 

FAQ
Questions you maybe inquiry

Q1:Could you custom goods?

We can manufacture it in accordance to your drawings or samples.

Q2: I want to buy your items, how can I pay?

A :You can spend by means of T/T , WEST UNION or other payment phrases we attain agreement.

Q3: How can you assure the top quality?

A: 1 year’s guarantee from B/L day.

If You meet with high quality problem, we guarantee to responsible for it.

Q4: If we do not locate what we want on your site, what should we do?

A: You can e mail us the descriptions and images of the products you require, We will check out whether we can make it.

Q5: Can we buy 1 pc of every item for good quality testing?

A: Yes, we understand quality examination is crucial and we are glad to deliver 1pc for top quality tests.

Q6: What is the direct time?

A: For this item, normally 3 days,three days and direct time is calculated from the working day we receive your deposit.

Exact time is established by factory schedule.

 

/ The use of unique gear manufacturer’s (OEM) part numbers or emblems , e.g. CASE® and John Deere® are for reference needs only and for indicating merchandise use and compatibility. Our business and the outlined EPT components contained herein are not sponsored, approved, or created by the OEM. /

Hydraulic  China  in   Diyarbakir Turkey   bowex m42 coupling sales  Plunger  in   Niigata Japan   flexible gear  factory  Hydraulic Pump Spare Parts for Ap2d25 with top quality lowest price

Company Video

Our Service
1. Installation & adjustment
After the equipment are arrived at the customer’s site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians’ guidance. Costs of the staff are decided at last.
2. Training
1)  We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users’technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
2)  The buyer can send staff to our company for learning.
3. Quality assurance
1)  We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
2)  We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
3)  We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
4)  The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.

Due to our sincerity in offering best service to our clients, understanding of your needs and overriding sense of responsibility toward filling ordering requirements, we have obtained the trust of buyers worldwide. Having accumulated precious experience in cooperating with foreign customers, our products are selling well in the American, European, South American and Asian markets. Our products are manufactured by modern computerized machinery and equipment. Meanwhile, our products are manufactured according to high quality standards, and complying with the international advanced standard criteria.

With many years’ experience in this line, we will be trusted by our advantages in competitive price, one-time delivery, prompt response, on-hand engineering support and good after-sales services.

Additionally, all our production procedures are in compliance with ISO9001 standards. We also can design and make non-standard products to meet customers’ special requirements. Quality and credit are the bases that make a corporation alive. We will provide best services and high quality products with all sincerity. If you need any information or samples, please contact us and you will have our soon reply.

FAQ:
Q1: Are you trading company or manufacturer ?
A: We are factory.


Q2: How long is your delivery time and shipment?
1.Sample Lead-times: generally 10 workdays.
2.Production Lead-times: 20-40 workdays after getting your deposit.

Q3. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery.

Q4: What is your advantages?
1. Manufacturer,the most competitive price and good quality.
2. Perfect technical engineers give you the best support.
3. OEM is available.
4. Rich stock and quick delivery.

Q5. If you can’t find the product on our website,what do you next?
Please send us inquiry with product pictures and drawings by email or other ways and we’ll check.