Best China in Mecca Saudi Arabia lovejoy gear coupling price Quality in Bhopal India gear coupling hub price Hydraulic Spare Parts for Eaton Spve19 21 with top quality lowest price

Best  China  in   Mecca Saudi Arabia   lovejoy gear coupling  price  Quality  in   Bhopal India   gear coupling hub  price  Hydraulic Spare Parts for Eaton Spve19 21 with top quality lowest price

We – EPG Group the largest couplings and gears manufacturing facility in China with five distinct branches. For more details: Mobile/whatsapp/telegram/Kakao us at: 0086-13083988828 /

 

This table lists the company’s sale of most of products.
Sequence/Part no. Description
(1)  Rexroth / Uchida Rexroth A2FO/A2FM/A2FE10-250, A2F12-five hundred, A2VK5-55MA, A6V28-250, A7/8V28-500, A8V80-107  
  A6VM/A7VO28-five hundred, Uchida A8VO55-two hundred  
  A4VSO40-five hundred, A4V40-250, A4VG28-250,  A10VSO18-a hundred and forty,  A10VG28-sixty three  
  Uchida AP2D12-38,  A10V/VD/E40-forty three, Rexroth A11VG50,  A11VO40-260, A20VLO260  
   
(2)  Vickers PVB/MPVB5-a hundred and ten, PVQ10-32, MFB5-29,  PVE19-21,  PVH45-141, PVD45, PVM571,
  PVXS130-250
(3)  Eaton 3321,  3932,  4621,  5421,  6423,  7621, 78462  
(four)  Sauer Sundstrand SPV14-eighteen, PV20-27, MPV046, PV90R30-250  
(five)  Caterpillar VRD63, AP12-14, 320C, SPK10/10, SPV10/10  
  E200B new, 12G, 14G, 215, 245, 330B, PSV450, 992/963  
(six)  Liebherr LPVD45 / 64 / 90 / 100 / 125 / 140 / 250 / 260  
(7)  Linde HPR75/one hundred/130/160, B2PV35-a hundred and forty, BMF50-105, BPV35-70, BMV75.27, BPR140/186/260  
(eight)  Parker / Volvo F11-005 / 571 / 150 / 250,  F12-060 / 080 / 110  
(9)  Kawasaki / Teijin Main pumps: K3SP36C, K3V63-280, K5V80-200, NV64-270, NX15, NVK45, KVC925-932  
  Swing motors: M2X63-210, M5X130-180, MX150-five hundred  
  Travel motors: MAG150-one hundred seventy, GM05/06VL, GM05/07VA, GM08-23/30H/35VA/35VL/38VB, DNB08  
(ten)  Komatsu Main pumps: HPV35/fifty five/90/95/132/160, PC40-8, PC60-seven, PC100/200/three hundred/360/400  
  Swing motors: PC45R-8, 60-six/seven, KMF40-one hundred and five, KYB33-87, PC200-six/seven, 300, 400, 650  
  Travel motors: HPV105  
(11)  Hitachi Main pumps: HPV091 / 102 / 116 / 125B / 145  
  Swing motors: EX120-two/5  
  Travel motors: HMGC32 / 35, HMGE36, EX550-three  
(twelve)  Toshiba Swing motors: SG02 / 571 / 04 / 08 / 12 / 571, PVC90R, PV090  
(thirteen)  Kayaba / Sumitomo MSG-27P/44P, MSF-85, MAG-33VP, JMV-53/34, PSVD2-21E/26E, PSV2-55T, 280  
(14)  Kobelco Travel motors: SK200-1/three/six, SK220-two/3 (MA340), SK320 & SK430  
(15)  Nachi PVD-2B-32L / 34 / 34L / 36L/38/forty/42, PVK2B-505, YC35-six  
(sixteen)  Kato Travel motors: HD400 / HD450V-2 / HD1571 / HD3000  
(17)  Tokiwa MKV23 / MKV33
(eighteen)  Bobcat 331 & 337
(19)  Hawe V30D95-250, V60N
(20)  Tadano Tadano 100, 150
(21)  Denison PV29-seventy four
(22)  Parker Parker BMHQ30/PV092/one hundred forty/one hundred eighty  
Rotary group parts for hudraulic piston pump,meet with special market,
advanced technology,perfect design,top quality Very good manufacturing facility cost  

Our company can supply a huge amount of  piston pump (motor) components, Particular versions are as follows:

 We sell the  hydraulic piston pump (motor) which presently has more than 1185 varieties of varieties and reducer assembly components varieties has a lot more than 12367 types of (including plunger sliding boots, cylinder, oil distribution plate, swing, variable piston, travel shaft, skeleton oil seal, equipment pump, rod, stress plate, central shaft, spindle, inclined plate, the ball hinge spring, ball joint, again plate, the thrust plate, friction plate, separator, oil distribution disc plug, bushing spring and other parts).We think there is always a solution that you will want.

Merchandise Description:

 

Much more brand names of pumps elements:

EPT EXCAVATOR Series:
HPV35 (PC60) HPV55 (PC120) HPV90 (PC200-3) HPV90 (PC200-five) PHV95 (PC200-six, PC120-six in addition to the pump shaft). HPV132 (PC300-7, PC400-six) HPV160 (PC300/four hundred-3/5) HPV135 PC30UU PC40-eight primary pump PC50 (PC55/56) PC60-7 primary pump (HPV75) PC160 PC200-2 (principal pump) PC200-eight main pump/PC240-eight main pump PC320 PC360-7 principal pump (PC300-seven) PC400-seven main pump PC1250 primary pump PC45R-8 rotation PC60-6 rotation PC60-seven rotary PC120-6 rotation PC200 – six rotary/LMF45 PC200-seven rotary motor PC450 rotation PC300-6 rotation PC200-7 wander PC400-seven wander HPV220-eight rotation PC650 rotary.

 

CAT Collection:
VRD63 (CAT120) double pump SBS80 (CAT312C) main pump E200B (new) double pump AP – twelve double pump AP-fourteen (CAT325C) CAT320C double pump SPK10/ten (E200B) double pump SPV10/10 (MS180) double pump CAT12G CAT14G / 16 g CAT215 CAT245 Going for walks CAT330B motor Strolling PSV450 (AP-twelve) CAT992 CAT330C wander CAT385H.

 

KYB Sequence:
PSVD2-sixteen e (one.six 2 tons of sunvo intelligent) PSVD2-21 c (KYB) PSVD2-21 e (KYB) 4 t/SVD22 tiny dig major pump 27 PSVD2-26 e/e (KYB) KYB – twenty five cc (45 ishikawa island, long yasuda K040 / K045) Ishikawa island sixty PSVL-54 (yasuda KYB extended six tons of 155 motorists) PSVK2-twenty five KMF40 KMF40-two KMF90 (KPV90) PC200-one/2/3 (rotary, going for walks) KMF105 KYB33 KYB36 KYB37 KYB87 KYB90 (MSG – 60 p) MSG – 27 p (KYB)/LSGMF27/ten w MSG-forty four p (KYB)/LSGM44/ten w-R21 Mag-vp-480-e-2 (4-5.five tons of little excavators walking motor) MSF-eighty five (instead of ZF motor) PSV2 sumitomo 120-55 t (KYB) Sumitomo 280 rotary V25..

NACHI Series:
PVD-two-b-32 l PVD-2-b-34 stroll PVD-2-b-34 l (little dig principal pump) PVD 38/forty-2-36 b/l PVD-two-b-42 PVD -two-b-sixty three PVD45 Nachi one hundred thirty PVK-two-b-505 (ZAX55 primary pump) YC35-6 yuchai little dig a rotary motor YC35-6 yuchai minor dig walking motor PCLS 18-two hundred-b (yuchai fifty five rotary) The bobcats 331 drivers (rotary) The bobcats 337 going for walks (motor).

TOSHIBA Series:
SG02 SG571 (MFB40) SG04 (MFB80) SG08 (MFB160) SG12 SG20 (MFB250) PVB92 (PVC90RC08 / PVC70R) (8.five tons of motorists Toshiba eight tons, yuchai) PV090 PV092 (PV080 gm) PSVS – 90.

JIC Series:
JMV-44/22 JMV-53/34 (six to eight tons of little excavator walking motor) JMF-sixty four JMV147/ninety five JMF-151-VBR (22 sm1510117) JMF-one hundred fifty five.

LIEBHERR Series:
LPVD45 LPVD64 LPVD75 LPVD90 LPVD100 The new LPVD100 (914) LPVD125 The new LPVD125 LPVD140 LPVD250 LPVD260.

KOBELCO/KATO Sequence:
SK250-eight main pump SK200 – a third strolling motor SK220-3 (MA340 walking motor) SK200-6 strolling motor SK200-6 new walking Going for walks SK320 motor M3V150 (SK220-2) going for walks motor Strolling SK430 motor Kato four hundred motorists motor HD450V – two (kato) HD3000 DH55 fifty five motorists rotary motor (daewoo) T3X128 / daewoo 300-7 rotary Daewoo wander 225-seven Daewoo DH370 rotation Present day 60-seven rotary motor Modern day 480 rotary motor.

KAWASAKI Series:
K3SP36C (SDV36) eight tons medium-sized drivers major pump K3V63DT (K3V63BDT) K3V112DT K3V140DT K3V180DT K3V280 K3VG280 K3VG180 K3VL45 K5V80 K5V140 (doosan three hundred-7) K5V160 (present day three hundred-six main pump) K5V200 (450/470 in Japan, god steel 470, Keith 480 main pump) K7V63 NV64 NV84 NV111DT NV137 NV172 NV270 NX15 NVK45 metal drivers (god) KVC925 KVC930 KVC932.

KAWASAKI SWING Collection:
M2X63 M2X96 (EX200-2) M2X120 M2X146 (EX200-five) M2X150/170 (EX400) M2X210 (EX270/280/300) M5X130 (CAT320C) M5X180 (steel 350-8 god) MX150 MX173 MX500 MAG150 MAG170 LZV30 LZV120 LVW060 TM40VD walk Present day 300-5.

NABTESCO Vacation Series:
M2X63 M2X96 (EX200-2) M2X120 M2X146 (EX200-five) M2X150/one hundred seventy (EX400) M2X210 (EX270/280/300) M5X130 (CAT320C) M5X180 (metal 350-8 god) MX150 MX173 MX500 MAG150 MAG170 LZV30 LZV120 LVW060 TM40VD walk Contemporary 300-5.

REXROTH Sequence:
A4V40 A4V56 A4V71 A4V125 A4V250 A4VFO28 A4VSO40 A4VSO71 A4VSO125 A4VSO180 A4VSO250 A4VSO355 A4VSO500 A4VF500 / A4F500 A4VG28 (A4F571) A4VG40 A4VG45 A4VG50 A4VG56 A4VG71 A4VTG71 A4VG90 (32 A4VT90HW/r) A4VHW90 A4VTG90 fill oil pump (thick) A4VG125 A4VG125 pump A4VG125 pump kind (typical use) A4VG125 pump type A10VO28 (string) A4VG12 fill oil pump (big) A4VG140 A4VG180 A4VG250 A10SO16/eighteen A10VSO28 A10VSO45 A10VSO45/52 A10VSO63/52 A10VSO63/53 A10VSO71 A10VSO85 A10VSO100 A10VSO140 A10VG18 A10VG28 A10VG45 A10VG63 A10V43 (double pump) A10V63 A10VD40 (double pump) A10VD43 (double pump) A10VE43 A10VEC60 A10VSF28 A11V040 A11VG35 A11VG50 A11VO60 A11VO75 A11VO95 (A11V95) A11V130 A11V145 A11V160 A11V190 (A11VLO190) A11VO200 A11VO250 A11VL0260.

REXROTH BEND AXIS Series:
A2F5A2F12A2F23A2VK282VK28A2F28A2F55A2F80A2F107A2F160A2F200 A2V225A2F250A2V500A2V915A2F355A2F500A2F1000A2FO10A2FO12A2FO16A2FO23A2FO28A2FO32A2FO45A2FO56A2FO63A2FO80A2FO90/A2FE90A2FO107A2FO125(A2FM125)A2FO160A2FO180A2FO200A2FO250A2FO500A6V28A7V55/A8V55A7V58A7V80/A8V80A7V107/A8V107A7V160/A8V160A7V200A7V225A7V250A7V355A7V500A6VM/A7V1000A6VM/A7VO12A7VO28A7VO55A7VO80A7VO107A7VO160A6VM160A6VE160A6VM200A6VM500A7VO172A7VO200A7VO250A7VO355A7VO500.

REXROTH-UCHIDA Series:
one(REXROTH)A8VO55/A8VO80/A8VO80/6.three/A8VO107(SUMITOMO 280)/A8VO140/A8VO160/A8VO200
2(REXROTH)AP2D12( EPT 331MAIN PUMP)/AP2D16(Case 35)/AP2D21/AP2D18(IHISCE 45 Primary PUMP)/AP2D25(DH55 Main PUMP)/AP2D36/ZAX70 Main PUMP

SAUER Sequence:
PV20PV21(PVD21)PV22PVD22PV23(PVD23)PV24SPV6/119PV25PV26PV112OPV27MF16AMFO35MF500MPVO46/M46MPR63MPV45.

SAUER 90 Collection:
PV90R30PV90R42PV90R55PV90R75PV90R100BRL100PV90R130PV90R180PV90R250SPV14SPV15SPV18MMF571CMPT044M44HRR057.

EATON Collection:
3321/3331 (Eaton, 006) Eaton 3322 (EATON3322) 4621/4621-007 5421/5431 (Eaton 23) Keith 1460 (CASE1460) Keith CS05A Eaton 3932-243 Eaton 6423 (Eaton 24-7620-7621) Roller (Eaton, 78462).

EATON-VICKERS Collection:
PVE19TA19PVE21PVH45PVH57PVH74PVH81PVH98PVH106(HPN-1398)PVH131PVH141PVB5PVB6PVB10PVB15(PVQ32)PVB20PVB29PVBQA29-SRPVQ40/50PVB110TB35B45.

TOKIWA Sequence:

MKV23/MKV33

TADANO Collection:

(TADANO)100/a hundred and fifty
HAWE Collection :
V60AV60AV30D95V30Z95V30D140V30D250
LINDE Series: 
HPV55T HPR75 HPR100 HPR105 HPR130 HMR135 HPR160 , 160 B2PV35 B2PV50 (BPR50) B2PV75 (BPR75) B2PV105 (BPR105) B2PV140 BPV35 BPV50 BPV70 BPV100 BMV75.27 BPR140 BPR186 BPR260 BMF50 BMF75 BMF105.
PARKER SERIES:
F11-005F11-571F11-571F11-28F11-39F11-58F12-060F12-080/F12-090F12-a hundred and ten-MF-1HF11-150F11-250PVXS130PVXS180PVXS250PVSO250PV180PV250PLV250PVM-018PVM-571BMHQ30/PV180PAVC38PAVC65PAVC1002145/P214523PZ075270/PV270PVP76PV29PV74PV0087P76PVG130 BPSV600PVT38PVT38PVT64PK100PMT14/18P080P2105P2060BZ732-100SH5V/131.
YUKEN Sequence:
A16A22A37A45A56A70A90A145
HARVESTER Collection:
HPVMF23(T23C)HPVMF23.7T28CT30CT37C

All these add-ons are completely interchangeable with first, high top quality and reduced price tag.

Our Company Provider

one) We can help buyers style distinct goods or create goods according to buyers’design

two) We can print brand according to buyers’ requirement

three)We has exported to a lot of international locations,such as Korea, United states of america, German, and so on.

 

Buyer Services

1. You could electronic mail us through the Alibaba messaging method if you have a question

or would like to post a remark.

two. Typically, e mail will be responded to inside 24 hours except on each and every Sunday

and vacations. We will reply as soon as we back again in workplace.

two. We will send out you monitoring details to the e-mail deal with you have registered with Alibaba.

3. If you do not see what you are seeking for, just send out us an e-mail with photo/photo

and we will be happy to help you.

4. Constructive feedback is very critical to us.

 

Packaging & Shipping
Shipping Details

Shipping time is dependent on the location and other elements, it might up to seven perform times.

In order to make sure you acquire you order tax free of charge on import, we will declare it as a “Sample”with a reduce price.This lower value does not mirror the complete value you paid out.

Right after we ship the goods, we will e-mail you the shipping and delivery details, as well as tracking variety.

 

FAQ
Concerns you possibly inquiry

Q1:Could you custom made products?

We can manufacture it in accordance to your drawings or samples.

Q2: I want to get your goods, how can I spend?

A :You can shell out through T/T , WEST UNION or other payment conditions we get to arrangement.

Q3: How can you guarantee the good quality?

A: One particular year’s guarantee against B/L date.

If You meet with quality issue, we promise to responsible for it.

This autumn: If we do not discover what we want on your site, what must we do?

A: You can electronic mail us the descriptions and photographs of the items you require, We will verify no matter whether we can make it.

Q5: Can we acquire 1 computer of every single merchandise for high quality testing?

A: Yes, we understand high quality examination is essential and we are happy to send out 1pc for high quality screening.

Q6: What is the guide time?

A: For this product, usually 3 days,three days and guide time is calculated from the working day we acquire your deposit.

Specific time is decided by manufacturing facility schedule.

 

/ The use of unique tools manufacturer’s (OEM) portion quantities or emblems , e.g. CASE® and John Deere® are for reference reasons only and for indicating merchandise use and compatibility. Our organization and the listed EPT components contained herein are not sponsored, accepted, or created by the OEM. /

Best  China  in   Mecca Saudi Arabia   lovejoy gear coupling  price  Quality  in   Bhopal India   gear coupling hub  price  Hydraulic Spare Parts for Eaton Spve19 21 with top quality lowest price

Company Video

Our Service
1. Installation & adjustment
After the equipment are arrived at the customer’s site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians’ guidance. Costs of the staff are decided at last.
2. Training
1)  We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users’technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
2)  The buyer can send staff to our company for learning.
3. Quality assurance
1)  We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
2)  We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
3)  We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
4)  The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.

Due to our sincerity in offering best service to our clients, understanding of your needs and overriding sense of responsibility toward filling ordering requirements, we have obtained the trust of buyers worldwide. Having accumulated precious experience in cooperating with foreign customers, our products are selling well in the American, European, South American and Asian markets. Our products are manufactured by modern computerized machinery and equipment. Meanwhile, our products are manufactured according to high quality standards, and complying with the international advanced standard criteria.

With many years’ experience in this line, we will be trusted by our advantages in competitive price, one-time delivery, prompt response, on-hand engineering support and good after-sales services.

Additionally, all our production procedures are in compliance with ISO9001 standards. We also can design and make non-standard products to meet customers’ special requirements. Quality and credit are the bases that make a corporation alive. We will provide best services and high quality products with all sincerity. If you need any information or samples, please contact us and you will have our soon reply.

FAQ:
Q1: Are you trading company or manufacturer ?
A: We are factory.


Q2: How long is your delivery time and shipment?
1.Sample Lead-times: generally 10 workdays.
2.Production Lead-times: 20-40 workdays after getting your deposit.

Q3. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery.

Q4: What is your advantages?
1. Manufacturer,the most competitive price and good quality.
2. Perfect technical engineers give you the best support.
3. OEM is available.
4. Rich stock and quick delivery.

Q5. If you can’t find the product on our website,what do you next?
Please send us inquiry with product pictures and drawings by email or other ways and we’ll check.